Selection of Appropriate Performance Measures The report
Performance Measurement Framework for Highway Capacity Decision Making provides in-depth information and case study examples on a wide variety of specific performance measures. The tables below were developed using this resource and are intended to serve as a guide for selecting performance measures that are appropriate for the type of study that is being conducted. This list is not all-inclusive, but is intended to serve as a starting point for practitioners who are in the process of developing performance measures for planning purposes.
Transportation Factors | | Long Range Planning | Programming | Corridor Planning | Environmental Review |
| Mobility |
| Recurring Delay | O | | O | O |
| Trip Travel Time | O | | O | O |
| Travel Time Index | O | | O | O |
| Volume-to-capacity Ratio | O | | O | O |
| Level of Service | | | O | O |
| Vehicle Miles Traveled | O | | O | O |
| Mode Share | O | O | O | O |
| Reliability |
| Reliability Index | | | O | O |
| On-time Trip Reliability | | | O | O |
| Incident Duration | | | | O |
| Crash Analysis | O | | | O |
| Accessibility |
| Job Accessibility | | | O | O |
| Destination Accessibility | O | | O | O |
| Labor Force Accessibility | O | | O | O |
| Market Accessibility | | | O | O |
| Environmental Justice Accessibility Impact | O | | O | O |
| Safety |
| Safety | | | O | O |
| Crashes | | | O | O |
Environmental Factors | | Long Range Planning | Programming | Corridor Planning | Environmental Review |
| Ecosystem, Habitat, and Biodiversity |
| Loss of Habitat | O | | O | O |
| Natural Resource Plan Consistency | O | | | O |
| Animal-vehicle Collisions | | | | O |
| Loss of Native Plants | | | O | O |
| Water Quality |
| Water Quality Protection Areas | | | O | O |
| Hydromodification | | | | O |
| Loss of Riparian and Floodplain Areas | O | | O | O |
| Water Resource Plan Consistency | O | | O | O |
| Construction-related Water Quality Impacts | | | | O |
| Water Quality Standards Compliance | O | | O | O |
| Highway Runoff | | | | O |
| Impervious Surface | | | O | O |
| Wetlands |
| Ratio of Wetland Acres Taken and Replaced | O | | | O |
| Loss of High-quality Wetlands | | | O | O |
| Wetlands Plan Consistency | O | | O | O |
| Air Quality |
| Transportation Conformity | O | O | O | O |
| Carbon Monoxide and Particulate Matter Concentrations | O | | O | O |
| Climate Change |
| Greenhouse Gas Emissions | O | | | O |
| Infrastructure Vulnerability | | | O | O |
| Carbon Sequestration | | | O | O |
| Environmental Health |
| Air Toxics Concentrations | | | O | O |
| Air Toxics Exposure | | | O | O |
Economic Factors | | Long Range Planning | Programming | Corridor Planning | Environmental Review |
| Economic Impacts |
| Economic Impacts | | O | O | O |
| Economic Development |
| Economic Development | O | | O | O |
Community Factors | | Long Range Planning | Programming | Corridor Planning | Environmental Review |
| Land Use |
| Transportation Land Consumption | O | | O | O |
| Induced Development Land Consumption | | | O | O |
| Consistency of Induced Land Consumption with Land Use Plan | O | | O | O |
| Support of Project for Growth Centers | O | | O | O |
| Local-regional Plan Consistency | O | | O | |
| Archaeological and Historic Resources |
| Site Location | | | O | O |
| Artifact Location | | | O | O |
| Social |
| Community Cohesion | | | O | O |
| Noise | | | | O |
| Visual Quality | | | O | O |
| Emergency Response Time | | | | O |
| Citizens' Concerns | O | | O | O |
| Environmental Justice |
| Environmental Justice | O | | O | O |
Cost Factors | | Long Range Planning | Programming | Corridor Planning | Environmental Review |
| Cost |
| Cost Stability | | O | | O |
| Construction Cost Escalation Factor | | O | | O |
| Cost-effectiveness |
| Benefit/cost Analysis | O | O | O | |
| Project Unit Cost | | O | | |
| Qualitative Cost-effectiveness | | O | | |
| Construction Productivity Index | | O | | |
| Local/regional Match | O | O | O | |
| Private Investment | | O | | |